OWNER:
Conquista/Conoco
Falls City, Texas
ENGINEER:
Tensar Environmental Systems, Inc.
The Conquista
Uranium Processing Plant had closed production and required closure
of their uranium waste tailings impoundment. Conventional methods
of closure of the soft saturated tailings had proved to be expensive
and inefficient. Biaxial geogrids were placed over the tailings
that would barely support a person’s weight. A 2-foot thickness
of free draining sand was then placed on top of the geogrid, which
provided a drainage medium and worked with the grid to provide stability
and support for the final cap. The project was completed in 1992.