OWNER:
City of Daphne
1705 Main Street
Daphne, Alabama 36526
PROJECT
ENGINEER:
McCrory & Williams, Inc.
1703 Main Street
Daphne, Alabama 36526
DESIGN/CONSTRUCT
CONTRACTOR:
Synergy Earth Systems, LLC.
26240 Equity Drive
Daphne, Alabama 36526
The North
Main Street extension ties North Main Street into Highway 90 adjacent
to the Jubilee Square Shopping Center. The north end of this extension
was in a state of disrepair due to the condition of the roadway
side slopes. The side slopes had been progressively failing for
several years since their construction in 1995, and by 1999 the
failure activity was observed to be threatening the existing curb
and roadway pavement. SES entered into a design contract with
the Project Engineer to complete a design to repair the roadway
side slopes, and later contracted directly with the Owner to construct
the approved design.
The work consisted
primarily of the design and construction of a reinforced steep
slope (0.5H:1V) located at the toe of the existing roadway side
slope. The face of the reinforced slope was constructed using
geogrids and geotextiles to wrap each lift of fill material. Wire
forms were used as a construction expedient to maintain alignment.
Additional geogrids were used to provide primary reinforcing for
the slope. A slope (3H:1V) was constructed from the top of the
reinforced steep slope to the required final grade at the roadway
curb. Erosion control matting was used on the upper slope to minimize
erosion of the slope face until vegetation had been established.
This project
was partially funded for the City by the U.S. Natural Resources
Conservation Service. Nearly 600 feet of slope repair was successfully
constructed during a one-month period in early 1999
.