The development
of a large tract of land in Daphne, Alabama required significant
site improvement to provide primary access to the development.
The key components of the site improvements included construction
of two modular block retaining walls and installation of several
storm water management structures. These components were required
to provide the proposed entrance drive to the development crossing
a large ravine.
SES was retained
directly by the Owner to design and construct the proposed retaining
walls and to install the storm water management structure which
were designed by the Owner’s consultant. Site clearing and
the installation of other utilities were also included as part
of the work performed by SES. The retaining walls were each approximately
225 feet in length and had a combined face area of 4,600 square
feet. The walls were constructed using the mechanically stabilized
earth approach, with concrete modular blocks used as facing elements
and geogrids used to form the reinforced soil prism. Internal
and external retaining wall analyses, as well as global slope
stability analyses, were performed to design the geogrid elements.
The storm water management structures that were installed by SES
and its subcontractors included 64 linear feet of 84-inch diameter
concrete pipe and an energy dissipating headwall. SES began construction
of the work on the project in May of 2000 and completed the work
in July of the same year