Synergy finished
construction on the 2 walls for the SH 463 project in Madison,
MS in March 2011.
The project
consisted of a new roadway and the construction of a bridge across
a set of railroad tracks.
The walls are located along the approach embankments on either
side of the bridge and turn to go in front of the bridge abutments.
The project consisted of approximately 26,000 sf of retaining
wall.
Check back