Synergy has
been working with GCAC, a local firm in Mobile that has a series
of storage tanks along the Mobile River. Several new tanks have
been installed over soft soils using design/build services offered
by Synergy that incorporate the use of wick drains and hydraulic
loading to eliminate post construction settlement issues.
If you have
a project that requires new storage tank construction over soils
that will settle beyond acceptable limits, contact Synergy to
discuss options that may save your project time and money.